CHEYENNE, Wyoming - Ceramic sculptures shaped by memory, sensory experience and the natural world will fill the Esther and John Clay Fine Art Gallery at Laramie County Community College this fall.
CHEYENNE, Wyoming - Forty-six Laramie County Community College student-athletes earned national or regional academic honors following the 2025-26 academic year, including 29 selections to NJCAA All-Academic teams.
Laramie County Community College now offers health insurance to students through Student
Assurance Services. The insurance is available to students who are taking at least
seven credit hours.
Parking will be allowed in all established parking lots, with the exception of:
Residence Hall parking lots-permit only
South-side of Auto Body
Any grass or dirt areas
Within any fenced area
Parking maps are available in Student Services, the Library and at the Cashiers’ Offices. Parking
is continually monitored to determine space availability during high impact times.
GETTING AROUND
Visitors can to help them locate places around campus.
Construction Updates
+
-
Flexible Industrial Technology Building
A view of the construction work on the new Flexible Industrial Technology building.
Michael Smith/91ÁÔÆæ
Note: Only those who have business on the project construction sites are allowed on
the sites (behind the fence). They’re required by safety regulations to check in with
the contractor at the construction trailer. They're also required to wear the necessary
protective/safety gear, hard hats, reflective vests, etc.
Latest Information
Completed this week:
Set fume collectors
Set roof top units
Set transformer/gear
Installation of interior walls
Sheetrock finishing
Mechanical installation on the north and south pods is ongoing
Installation of aluminum windows is ongoing
Installation of exterior plywood is ongoing
Installation of metal wall panels is ongoing
Installation of exterior brick will be ongoing
Installation of the fire sprinkler will begin Feb. 22
Painting will begin Feb.29
Installation of hydronic lines will begin Feb. 29
Power switch-over will begin Feb. 29
Exterior framing will be completed March 2
Roofing on the east pod and lower roofs will be completed March 4
Site concrete and paving will begin March 14
Installation of acoustic panels, bathroom tile and overhead doors will begin April
1
Elevator installation will begin April 1
Sealing of concrete floors will begin May 2
Project Cost/Details
The $16 million, 46,000-square-foot building is projected to open in fall 2016.
The new building will be home to Diesel Technology, Engineering Technology, expanded
Welding Fabrication program, Construction Management, Process Technology and will
provide room for expansion of other budding programs.
The general contractor is FCI Constructors.
Student Services & University Center
Crews work on the steel framework of the Student Services/University Center. Michael
Smith/91ÁÔÆæ
Note: Only those who have business on the project construction sites are allowed on
the sites (behind the fence). They’re required by safety regulations to check in with
the contractor at the construction trailer. They're also required to wear the necessary
protective/safety gear, hard hats, reflective vests, etc.
Latest Information
Completed this week:
Miscellaneous structural steel detailing
Installation of Area A exterior sheathing
Concrete pour for the first floor east slab on grade
Installation of temporary windows in Area A
Installation of window sill blocking in Area A
Electrical rough-in to the transformer
Exterior metal stud framing for Area B is ongoing
Basement overhead mechanical, electrical, and plumbing work is ongoing
Installation of mechanical, electrical, and plumbing on the 1st floor Area B will be ongoing
Basement equipment set up is ongoing
Installation of Area B exterior sheathing will begin Feb. 25
Installation of parapet and curb blocking will begin Feb. 25
Concrete pour for the first floor conference rooms’ slab on grade will be completed
Feb.29
Installation of the exterior stairwell stucco will begin Feb. 29
Installation of Thermax joint treatment will begin Feb. 29
Corridor framing/pre-rock will begin Feb. 29
Interior wall layout will be completed March 4
Installation of mechanical, electrical, and plumbing rough-in on the roof-west half
will be completed March 4
Installation of mechanical, electrical, and plumbing rough-in on the roof-east half
will be completed March 11
Installation of roof drain piping will be completed by March 11
Installation of membrane on the roof in Area A will tentatively begin March 14
Installation of masonry veneer area A will begin March 14
Installing power across the loop road will begin March 14
Installation of the storm line across the loop road will begin March 14
Project Cost/Details
The $30 million, 85,000-square-foot building is projected to open its doors in spring
2017
The building will be home to several departments including Admissions, 91ÁÔÆæ Bookstore,
Student Records, Financial Aid, Counseling & Campus Wellness, Disability Services,
Advising and Career Services and University of Wyoming Outreach. It will provide classroom,
office and assembly space.
The general contractor is FCI Constructors.
Flexible Industrial Technology Building
A view of the construction work on the new Flexible Industrial Technology building.
Michael Smith/91ÁÔÆæ
Note: Only those who have business on the project construction sites are allowed on
the sites (behind the fence). They’re required by safety regulations to check in with
the contractor at the construction trailer. They're also required to wear the necessary
protective/safety gear, hard hats, reflective vests, etc.
Latest Information
Completed this week:
Set fume collectors
Set roof top units
Set transformer/gear
Installation of interior walls
Sheetrock finishing
Mechanical installation on the north and south pods is ongoing
Installation of aluminum windows is ongoing
Installation of exterior plywood is ongoing
Installation of metal wall panels is ongoing
Installation of exterior brick will be ongoing
Installation of the fire sprinkler will begin Feb. 22
Painting will begin Feb.29
Installation of hydronic lines will begin Feb. 29
Power switch-over will begin Feb. 29
Exterior framing will be completed March 2
Roofing on the east pod and lower roofs will be completed March 4
Site concrete and paving will begin March 14
Installation of acoustic panels, bathroom tile and overhead doors will begin April
1
Elevator installation will begin April 1
Sealing of concrete floors will begin May 2
Project Cost/Details
The $16 million, 46,000-square-foot building is projected to open in fall 2016.
The new building will be home to Diesel Technology, Engineering Technology, expanded
Welding Fabrication program, Construction Management, Process Technology and will
provide room for expansion of other budding programs.
The general contractor is FCI Constructors.
Student Services & University Center
Crews work on the steel framework of the Student Services/University Center. Michael
Smith/91ÁÔÆæ
Note: Only those who have business on the project construction sites are allowed on
the sites (behind the fence). They’re required by safety regulations to check in with
the contractor at the construction trailer. They're also required to wear the necessary
protective/safety gear, hard hats, reflective vests, etc.
Latest Information
Completed this week:
Miscellaneous structural steel detailing
Installation of Area A exterior sheathing
Concrete pour for the first floor east slab on grade
Installation of temporary windows in Area A
Installation of window sill blocking in Area A
Electrical rough-in to the transformer
Exterior metal stud framing for Area B is ongoing
Basement overhead mechanical, electrical, and plumbing work is ongoing
Installation of mechanical, electrical, and plumbing on the 1st floor Area B will be ongoing
Basement equipment set up is ongoing
Installation of Area B exterior sheathing will begin Feb. 25
Installation of parapet and curb blocking will begin Feb. 25
Concrete pour for the first floor conference rooms’ slab on grade will be completed
Feb.29
Installation of the exterior stairwell stucco will begin Feb. 29
Installation of Thermax joint treatment will begin Feb. 29
Corridor framing/pre-rock will begin Feb. 29
Interior wall layout will be completed March 4
Installation of mechanical, electrical, and plumbing rough-in on the roof-west half
will be completed March 4
Installation of mechanical, electrical, and plumbing rough-in on the roof-east half
will be completed March 11
Installation of roof drain piping will be completed by March 11
Installation of membrane on the roof in Area A will tentatively begin March 14
Installation of masonry veneer area A will begin March 14
Installing power across the loop road will begin March 14
Installation of the storm line across the loop road will begin March 14
Project Cost/Details
The $30 million, 85,000-square-foot building is projected to open its doors in spring
2017
The building will be home to several departments including Admissions, 91ÁÔÆæ Bookstore,
Student Records, Financial Aid, Counseling & Campus Wellness, Disability Services,
Advising and Career Services and University of Wyoming Outreach. It will provide classroom,
office and assembly space.
The general contractor is FCI Constructors.
Spotlights
Laramie County Community College recently signed a deal with the University of Wyoming
to strengthen and ease the transfer process between the two schools. 91ÁÔÆæ is the first
community college in Wyoming to have general education requirements correspond between
the two colleges.
The Clay Pathfinder Building from a drone view. This is where new students start at
91ÁÔÆæ to get enrolled in classes.
Men's Basketball Game
Photo of the 91ÁÔÆæ Men's Basketball team playing in the newly renovated RAC on campus.
91ÁÔÆæ Commencement
The 91ÁÔÆæ Commencement ceremony in the RAC Competition gym with the graduates and audience
all standing for the Pledge of Allegiance. The graduates are in the middle in caps
and gowns and a stage is to the left. Families and friends are all around the graduates
in the gym.
Recreation & Athletics Complex
Drone view of the newly renovated Recreation & Athletics Complex.
91ÁÔÆæ Campus
A drone view of campus with Flex Tech on the east side of campus closest.
Students in class
Several students sitting in accounting class holding up "asset" cards in response
to a question from the instructor.
Talon at the 91ÁÔÆæ Rodeo
91ÁÔÆæ's mascot, Talon, rides a horse in the opening of the 91ÁÔÆæ Shawn Dubie Memorial
Rodeo.
Corn Hole on campus
91ÁÔÆæ students play corn hole outside the Clay Pathfinder building.
Diesel Program
A Diesel Program student is working in class on wiring.
Nursing Pinning Ceremony
A new nursing graduate receives hugs from her children on stage during the pinning
ceremony.
Vegas Night
91ÁÔÆæ Student Engagement hosts a Vegas Night in the Clay Pathfinder Building with staff
serving as dealers and students playing games and winning prizes.
91ÁÔÆæ Commencement
91ÁÔÆæ graduate shakes hands and hold diploma cover on stage with 91ÁÔÆæ President in
caps and gowns.
Talon Rocks Concert
Students in the McIlvaine Plaza on campus during the Talon Rocks concert and dinner
event.
Volleyball on Campus
Students playing volleyball in the sand on campus next to the residence halls and
Science Center.
Clay Pathfinder Building
The Clay Pathfinder Building from a drone view. This is where new students start at
91ÁÔÆæ to get enrolled in classes.
Men's Basketball Game
Photo of the 91ÁÔÆæ Men's Basketball team playing in the newly renovated RAC on campus.
91ÁÔÆæ Commencement
The 91ÁÔÆæ Commencement ceremony in the RAC Competition gym with the graduates and audience
all standing for the Pledge of Allegiance. The graduates are in the middle in caps
and gowns and a stage is to the left. Families and friends are all around the graduates
in the gym.
Recreation & Athletics Complex
Drone view of the newly renovated Recreation & Athletics Complex.
91ÁÔÆæ Campus
A drone view of campus with Flex Tech on the east side of campus closest.
Students in class
Several students sitting in accounting class holding up "asset" cards in response
to a question from the instructor.
Talon at the 91ÁÔÆæ Rodeo
91ÁÔÆæ's mascot, Talon, rides a horse in the opening of the 91ÁÔÆæ Shawn Dubie Memorial
Rodeo.
Corn Hole on campus
91ÁÔÆæ students play corn hole outside the Clay Pathfinder building.
Diesel Program
A Diesel Program student is working in class on wiring.
Nursing Pinning Ceremony
A new nursing graduate receives hugs from her children on stage during the pinning
ceremony.
Vegas Night
91ÁÔÆæ Student Engagement hosts a Vegas Night in the Clay Pathfinder Building with staff
serving as dealers and students playing games and winning prizes.
91ÁÔÆæ Commencement
91ÁÔÆæ graduate shakes hands and hold diploma cover on stage with 91ÁÔÆæ President in
caps and gowns.
Talon Rocks Concert
Students in the McIlvaine Plaza on campus during the Talon Rocks concert and dinner
event.
Volleyball on Campus
Students playing volleyball in the sand on campus next to the residence halls and
Science Center.
Your future starts here! Become a Golden Eagle today!